Overview

PROJECT: Adidas LDN Flagship Store

LOCATION: Oxford Street, London

STEELWORK CONTRACTOR: Littlehampton Welding Ltd

MAIN CONTRACTOR: Ramboll

ARCHITECT: PLP Architecture

COMPLETED: 2019

Project Details

The 425 Oxford Street retail scheme involved reconfiguration and extension of the lower five floors of a 10-storey building in the West End shopping district to create the new 45,000 sq. ft. global flagship Adidas LDN store.

The project called for an extensive new steel frame structure throughout the reconfigured and extended building. Gyoury Self worked alongside the steel fabricator to provide steel connections design services.

Undertaken in a series of phases, the project started on site at the end of August 2016. Handover of the bespoke scheme to Adidas took place in 2019.

Detailed design projects such as this can present challenges in terms of co-ordination, but our engineers and technicians worked in close collaboration with the project design team within the BIM environment to successfully deliver the project.

Do you need Steel Connection Design Services?

We offer Steel Connection Design Services for clients UK-wide.  Please call T: 01273 414413 to speak with an engineer, or contact us to find out how we can help.

More Case Studies

Artists impression of Mildenhall Hub
Artists impression of Edinburgh St James
Artists Impression of Adidas London
Steel Connection Case Study Image
Steel Connection Case Study Image
Steel Connection Case Study Image